Tims Rans Coyote II
|
Tim picked up the crate in July of 04
The control sticks were soon bolted in
Then the seats were fitted
Then the dash panel was fitted
A view of the fuselage.
The fuel tank is installed.
A detail of the control cables <
The assembled fuselage before covering.
Another view of the fuselage |
Thank You For Visiting Tims Rans Coyote II Page
Back to EAA Chapter 1314 Builders